Needs + challenges
When shaping his vision – and transforming an old service station site into a warehouse
for his client, The Laminex Group – Gerard said Bison was the clear choice to meet several
key needs and deliver more than expected. This included smart ways to save time
(especially by building the roof on the ground, rather than at height), superior strength
and durability, all-weather loading and unloading, clever capacity-adding ideas, and a
highly efficient construction process. Structural integrity was especially important for the
roof, with its 45-metre span and the demands of holding 100 kw of solar panels.
Success made simple
The process was a dream for Gerard, who was “very impressed with the professional
approach and how easy it was to talk to them … everyone knew what they were doing
(and) just worked together like one big family”. He said the clear spans achieved are
“amazing when you look at the engineering of it”. For him, there are many standout
features.
- An extensive awning area that is the “envy” of truck drivers, allowing B-Doubles
and semis to load and unload undercover, safe from sun and rain. - A mezzanine floor that adds significant pallet racking storage.
- Doors hung higher than openings for bird-proofing.
- Concrete tilt-up panels for protection against bumps, scrapes and vermin.
- A cost-effective build: “Because they do it all the time and are set up so
professionally, they can do them at a very competitive price.”