18 CHEROKEE DRIVE

Maximising every metre

Needs + challenges

Located in the growing Cambridge industrial precinct, 18 Cherokee Drive was designed to meet the demand for high-quality, flexible warehouse and office facilities. With many local and national businesses investing in the area, the challenge was to create a development that could accommodate modern operational requirements while appealing to a diverse range of tenants.

Key challenges included:

  • Delivering a clear-span warehouse that maximises usable floor space.

  • Providing modern office and amenity areas to support day-to-day operations.

  • Ensuring flexibility through mezzanine storage and fitout options.

  • Designing for accessibility, vehicle movements, and weather protection.

  • Achieving a boundary-to-boundary footprint for maximum land utilisation.

Success made simple

Bison Constructions delivered a bespoke industrial facility that combines strength, durability, and user-focused design. With a seamless construction process, this project was delivered ahead of schedule & budget, which is another demonstration of Bison’s proven project methodology.

Project highlights include:

  • Spacious Warehouse – 1,394m² clear-span design for maximum operational efficiency.

  • Boundary-to-Boundary Build – Full tilt panel wall construction maximises land use and structural durability.

  • Modern Office & Amenities – 90m² ground floor space with kitchen, toilets, and open plan office.

  • Flexible Mezzanine – 90m² of storage space, adaptable for future office fitout.

  • Excellent Access – Two 5m x 6m electric roller doors at the front and two additional roller doors providing access to the rear storage yard.

  • Weather Protection – 90m² cantilever awning to ensure all-weather functionality.

  • Industrial Capability – High-bay LED lighting, three-phase power (80 amps per phase), and secure site parking with 10 dedicated car spaces.

Project gallery

cs-image
cs-image
cs-image
cs-image
cs-image
cs-image
cs-image
cs-image

The results

  • On-Time Delivery: Scheduled for completion in June 2025, ensuring tenant confidence in move-in planning.
  • High Functionality: Clear-span warehouse, boundary-to-boundary footprint, and multiple roller doors support seamless operations.
  • Tenant Flexibility: Mezzanine and office fitout options tailored to evolving business needs.
  • Benchmark Process: Recognised by project partners as an exceptional example of what can be achieved through trust, collaboration, and proactive management.
  • tes-image

    “Communication was consistently clear and proactive, allowing the project to be delivered not only within budget but ahead of schedule—an increasingly rare achievement in our industry.”

    Simon Mehegan

    JPS Property

    circle-image

    Still have questions?

    Call our dedicated sales and support team

    (03) 6352 4449

    Open Monday to Friday, 7:30am–5pm AEST

    Other projects you may be interested in